Pipeline QC Inspection & Shim Records Guide
Quality control documentation for shim installations is a critical requirement in pipeline construction. Proper shim records ensure traceability, compliance, and accountability throughout the project lifecycle.
Why QC Shim Records Matter
- Regulatory compliance for pipeline construction codes
- Traceability of materials and installation quality
- Audit trail for project handover documentation
- Liability protection for contractors and engineers
Essential Shim Record Data Points
- Support location identifier and line number
- Shim material type and grade certification
- Shim thickness and quantity at each location
- Installation date and installer identification
- QC inspector sign-off and verification date
- As-built elevation measurements
QC Inspection Checklist for Shim Installations
- Verify shim material matches specification requirements
- Confirm shim stack height within allowable limits
- Check shim coverage area under pipe support
- Inspect for proper shim orientation and alignment
- Verify tack welds or securing methods are applied
- Document any non-conformances or deviations
Digital QC Records with ShimSheet
ShimSheet eliminates paper-based QC documentation. Inspectors can record shim data, capture photos, and generate professional PDF reports directly from the field. All records are timestamped and stored securely in the cloud.